UCL Discovery Stage
UCL home » Library Services » Electronic resources » UCL Discovery Stage

Collaboration in BIM-based construction networks: a qualitative model of influential factors

Oraee, M; Hosseini, MR; Edwards, D; Papadonikolaki, E; (2021) Collaboration in BIM-based construction networks: a qualitative model of influential factors. Engineering, Construction and Architectural Management 10.1108/ecam-10-2020-0865. (In press). Green open access

[thumbnail of 2021_ECAM-Collaboration in BIM-based construction networks-A qualitative model of influential factors_Oraee.pdf]
Preview
Text
2021_ECAM-Collaboration in BIM-based construction networks-A qualitative model of influential factors_Oraee.pdf - Accepted Version

Download (828kB) | Preview

Abstract

PURPOSE: The purpose of this paper is to present a modified model for collaboration in BIM-based construction networks (BbCNs). Though BIM is increasingly adopted and implemented across the construction industry, the problems associated with the lack of collaboration among teams in BbCNs remain a major hindrance to reaping the full potential of BIM. Previous studies have been conceptual in nature. This paper, therefore, attempts to modify and validate existing conceptual models that describe collaboration in BbCNs. DESIGN/METHODOLOGY/APPROACH: To modify the conceptual model for collaboration in BbCNs, qualitative data through semi-structured interviews with BIM experts in the industry were collected and analysed using qualitative methods including the use of NVivo software. FINDINGS: The proposed model includes influential factors and their sub-factors to collaboration in BbCNs, as well as considering their indicators. Findings reveal that several overlooked concepts, particularly unfavourable BIM contractual arrangements, act as the root causes of the unwillingness of team members in BbCNs to engage in collaborative efforts. RESEARCH LIMITATIONS/IMPLICATIONS: The study's findings must be viewed in light of several limitations. First, the interviewees in this study were based in Australia hence their perceptions of BIM collaboration are reflective of the sociotechnical setting of BIM-enabled projects in this country. Also, the findings are based on the perception of experts in the field, rather than analysis of performance measures or quantitative assessment of associations among collaboration outcomes and various factors. This, however, provides the field with fertile grounds for future research. PRACTICAL IMPLICATIONS: The study benefits researchers by shifting the collaboration discourse in BIM-enabled projects from technology-related issues to the people and contractual-related domains. Moreover, the developed qualitative model provides industry professionals with a point of reference to improve collaboration on BIM-enabled projects. SOCIAL IMPLICATIONS: The study benefits researchers by shifting the collaboration discourse in BIM-enabled projects from technology-related issues to the people and contractual-related domains. Moreover, the developed qualitative model provides industry professionals with a point of reference to improve collaboration on BIM-enabled projects. ORIGINALITY/VALUE: Arguments provided in this study highlight the necessity of considering the contractual arrangement of BIM-related projects and foster the willingness of team members to collaborate. This can be addressed using clear and comprehensive BIM execution plans and clearly explaining the role of BIM managers in the process.

Type: Article
Title: Collaboration in BIM-based construction networks: a qualitative model of influential factors
Open access status: An open access version is available from UCL Discovery
DOI: 10.1108/ecam-10-2020-0865
Publisher version: https://doi.org/10.1108/ECAM-10-2020-0865
Language: English
Additional information: This version is the author accepted manuscript. For information on re-use, please refer to the publisher’s terms and conditions.
Keywords: Building information modelling, Coordination, Barrier, Interview, Contract
UCL classification: UCL
UCL > Provost and Vice Provost Offices > UCL BEAMS
UCL > Provost and Vice Provost Offices > UCL BEAMS > Faculty of the Built Environment
URI: https://discovery-pp.ucl.ac.uk/id/eprint/10125774
Downloads since deposit
9,864Downloads
Download activity - last month
Download activity - last 12 months
Downloads by country - last 12 months

Archive Staff Only

View Item View Item